Mayor· 2022-07-01 to 2030-07 (month-level end: July 2030 per Kenner council page, council serves four years concurrent with the mayor; start = July 1 2022 swearing-in per mayor bio, re-sworn at July 1 2026 inauguration per The Advocate photo caption)
Michael J. Glaser
Kenner
No biography on file yet.
Voice
- Meetings spoken in
- 17
- Total speaking time
- 1:33:12
- Avg per meeting
- 5:29
- Segments
- 1267
Want every word Glaser has said?
The OpenCity MCP for Claude.ai answers questions like “what has Glaser said about housing this year” with one prompt — full speaking history, with YouTube timestamps.
Top issues during term (9)(Roads)
Roosevelt Boulevard construction ahead of schedule
Unanticipated stump removal and drainage work means extra funds, though the project is FEMA-related and may run ahead of schedule.
Power Boulevard resurfacing and U-turn safety
$178,856 for engineering services; construction to be funded through DOTD and federal aid.
West Esplanade bridge condition
$130,380.99 in ratified emergency repairs, with replacement costs to come.
Kenner Loop transit overhaul
Rides in the lift zone are paid by Jefferson Parish, so no new cost for Kenner riders.
Loyola Drive and Veterans Memorial Blvd. resurfacing
City's 20% local match on roughly $2.6 million in combined construction, plus $480,000 in engineering contracts.
Major road resurfacing push
Four-way stop at Loyola and Pellarin
A traffic study to even consider removal would run about $7,500-$10,000.
Road resurfacing and new bike path
Federal grant funds accepted; local amount not stated.
Concrete street maintenance funding boost
Up to $1.2 million per year of city spending on drainage repairs.